Going solar is simpler than you think. We handle 100% of the permitting, engineering, and HOA approvals for you.
01
Free Analysis & Design
We analyze your bills and roof to design the perfect system. You see exactly how much you'll save before signing anything.
02
Engineering & Permitting
Our team creates structural and electrical plans, submits for city/county permits, and handles HOA applications.
03
Professional Installation
Our certified crew installs your system in 1-2 days. We treat your home like our own—clean, safe, and professional.
04
Activation & Savings
After final inspection and utility interconnection (PTO), you flip the switch and start generating your own clean power.
Total time from signing to activation is typically 6-8 weeks, with the actual installation taking just 1-2 days.